Drowning in Fabric

Forever cleaning, organizing and creating

April review and May goals

on April 30, 2013

April:

Sewing-

  1. Finish ribbon chevron top – border. Back? no
  2. Complete Ispy tops and backs for nephews. I completed one top. Still waiting on swap return to make other top.
  3. Bento Box top I have two pieces of border to assemble and this is done. Will finish tonight.
  4. Pick fabrics and follow along for bloom bloom pow.    I have followed to the point where I need to cut my triangles. The ruler came today. I plan to start cutting tonight.
  5. Finish and hang the fabric hoops for the kidlet’s room. YES! YAY!
  6. Finish cleaning and reorganizing sewing room  This is an ongoing endeavor.
  7. Plot and sew rainbow twister quilt. And start twisting, if I get that far no
  8. Finish last 3×6 block, April mystery border, send all.  all done and sent
  9. Go to Stash Bash!! YAY!
  10. Make any things that need to be made for stash bash. (I am seriously lacking in information)
  11. Pick off a few things for the city craft pinterest challenge Ive made a couple, but not officially added them.

Swaps –

  • waiting on abc blocks still waiting
  • waiting on tula pink rounds 3,4,5 still waiting
  • Send back polka dots sent
  • send back Lizzy House jewels this got held up waiting on one set. Will go out soon.
  • send back ocean i spy sent
  • send back jar i spy waiting on them to arrive
  • open April f8 swap  opened and filled

Cleaning-

  1. Finish office bookshelves *sigh*
  2. Work on garage on weekends with hubs this is disgraceful so far
  3. Get the baby’s swingset installed!!! (why did I list this under cleaning?) it gets worse!
  4. Closet OMG did I do anything this month?
  5. Hang photos I’ve hung several, but still have a couple leaning against the wall to be hung.
  • Weight loss maintaining, but not losing 😦
  • smoothie diet no 😦
  • I have a lot of dr appts to make. Oh geez. Can you tell I have an issue with doctors? I did make the baby’s 2 year appt, but that wasn’t even on the original list of appts that need to be made.
  • Read read read!
  • Green focus on the bathroom never did any posts about this
  • Cleaning focus on guest bedroom haven’t done much in there either.

Ok. Wow. So I had mixed success last month. Here we go for this month: (keep in mind I am not home for most of this month)

May goals:

Sewing-

  1. Finish ribbon chevron top – border. Back?
  2. Complete Ispy tops and backs for nephews. (finish tumbler quilt – back, quilt, bind; make second top)
  3. Bento Box back (no ideas on this)
  4. finish bloom bloom pow. (top, back, quilt and bind)
  5. Finish cleaning and reorganizing sewing room
  6. May mystery border
  7. Pick off a few things for the city craft pinterest challenge

Swaps –

  • waiting on abc blocks
  • waiting on tula pink rounds 3,4,5
  • send back Lizzy House jewels
  • send back jar i spy
  • open May f8 swap

Cleaning-

  1. Get the baby’s swingset installed!!!
  2. Closet
  3. Hang photos
  • Weight loss
  • Baby’s birthday party planning
  • I have a lot of dr appts to make.
  • Read read read!
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: